Client
The Sobrato Organization
Project
Commonwealth Phase 3
Location
Menlo Park, CA
Description
Design of a 250,000 square foot, 4-story Class ‘A’ warm shell office building with a 4-level parking structure. The building completes a three building campus along with two existing 4-story buildings completed in 2016, also designed by ARC TEC.